Send Me The Latest Product Alerts
(No SPAM - We would not sell or share your e-mail address.)
Home ProductsClimbing Formwork

cantilever climbing formwork for concrete pouring of piers, building systems

  • Product Details

cantilever climbing formwork for concrete pouring of piers, building systems

Good Quality cantilever climbing formwork for concrete pouring of piers, building systems Sales

Large Image :  cantilever climbing formwork for concrete pouring of piers, building systems

Beijing Yunhai Construction Hardware Co., Ltd.

Active Member

Beijing, China (Mainland)

Business type: Manufacturer, Seller

No. 449, Wucao Road, Qingfang Apparel Park, Tongzhou District,China (Mainland)

Product Details:

Place of Origin: Beijing, China (Mainland)
Brand Name: Yunhai
Certification: ISO
Model Number: PJ200 & PJ240
Auto climbing: oil cyclinder
Detailed Product Description

cantilever climbing formwork for concrete pouring of piers, building systems

 

 
1. PJ200 & PJ240 Climbing Formwork
2. suitable for dam, high building ( 100 meters high)
3. can stick to the concrete tightly


 

 

 

Product Name:Climbing Formwork

Introduction:


The cantilever climbing formwork PJ200 & PJ240 are widely used in concrete pouring of piers, high-rise buildings, and a variety of other structures.
The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods. Therefore, additional reinforcement is not needed. The construction is easy, rapid and economical, and the surface of the concrete is slick.
The biggest advantage of PJ series is light in weight and convenient in use. The operation platform width of PJ200 and PJ240 is 200cm and 240cm respectively.

 


The Characteristics


The formwork unit can move backwards up to 600mm.
The formwork is flexible to adjust from all directions.
The inclination can be adjusted by pull-push prop and is up to 18°.
Reasonable structure and light weight.
High level of universality and standardization for connection components.

Structure Sketch

 


The Concrete Pouring Process

The first pouring
Before pouring, fix the anchor system on the plywood by M30 position bolt or construction bolt. Reinforce the formwork by wall- through tie rods.

 

 

The second pouring(the first lift)
Climbing brackets are used in the second pouring. Fix the anchor shoe in the bowl-climbing cone by tensile bolt, hang the bracket on the anchor shoe, and then insert the safe pin.

 

   

 

The third pouring(the second lift)
Fix suspended platform under the climbing bracket. Workers can remove the tensile bolt, anchor shoe and bowl-climbing cone for reusing, and then fill the holes left by bowl-climbing cone. This pouring process is the standard pouring; the later lifting process is the same, till the concrete pouring is finished.

              

 

1 formwork panel H=4000mm m2
2 suspending scaffold   set
3 Diagonal bracing   set
4 threaded rod D15 m2
5 Flynt D15 Pc
6 Shim block D20 Pc
7 Shaft Platform Beam 2.1-2.7m set
8 Anchor cone (Climing cone) M30/D20 Pc
9 bolt M30X80 Pc
10 Mold Releasing agent   Litre
11 plate,steel pipe,Guardrail    
12 Screw and nut M16X120 set
13 Expension bolt M12X60 set
 

 

Contact Details
China Climbing Formwork Online Market

Send your inquiry directly to us (0 / 3000)